Friday, November 03, 2006

Chicago OOB tie-down

Tom Johnson was able to get the tie-down info for the POTS line in Chicago. Level3 should now be able to process their cross-connect to Chicago, so we may have OOB when we leave the install next week. Another engineer is working on the dialer configuration for us. Since we normally use ISDN line, we want to make sure we can route over these lines on-demand.